Data Centre & IT
Data centre, server and IT equipment sourcing
CRS PLUS sources server and data centre hardware for operators, integrators and enterprise IT teams across the Middle East and Africa — complete rack servers, the processors, memory, drives and adapters inside them, and the mechanical spares that keep an installed estate running. The catalogue below is indexed by part number, because that is how this equipment is actually bought: the buyer already knows the SKU and needs a source that can confirm condition, availability and lead time without a sales cycle.
01Server & data centre catalogue
Equipment we source, indexed by part number
Eleven categories covering complete rack servers, the processors, memory, drives and adapters inside them, and the spares that keep an installed estate running. Each category lists the manufacturers we source from and the individual part numbers under each. Listing does not indicate stock held — condition, availability and lead time are confirmed per enquiry.
Servers
Rack servers — Dell PowerEdge and HPE ProLiant
Browse part numbers 42 line items ·Server Processors
Server processors — Intel Xeon E5 and Xeon Scalable
Browse part numbers 4 line items ·GPU & Accelerators
GPU and AI accelerator cards
Browse part numbers 55 line items ·Server Memory
Server memory — DDR4 ECC RDIMM and LRDIMM
Browse part numbers 71 line items ·Server Storage
Server storage — SAS, SATA and NVMe drives
Browse part numbers 6 line items ·Enterprise Storage
Enterprise storage systems and disk shelves
Browse part numbers 19 line items ·Network Adapters
Server network adapters — 1GbE to 40GbE
Browse part numbers 21 line items ·Power Supplies
Server power supplies — hot-plug PSUs
Browse part numbers 7 line items ·RAID & HBA
RAID controllers and host bus adapters
Browse part numbers 8 line items ·Data Centre Switching
Data centre switching and optics
Browse part numbers 43 line items ·Server Spares
Server spares — boards, backplanes, cooling and rails
Browse part numbers02Cross-sector equipment
Equipment categories currently catalogued that also serve this sector
03How it works
From enquiryto delivery.
One process for every requirement, whether it is a single part number or a full bill of quantities.
Send the requirement
Part-number list, bill of quantities, site list or tender document, in any format.
Review and clarification
We review the requirement and confirm anything unclear before quoting rather than assuming.
Structured offer
Configuration, condition, lead time, warranty and delivery terms, within 72 hours on average.
Inspection and delivery
Goods are inspected against the purchase order before shipment and delivered with full documentation to port or site.
Send your requirement
A part-number list, bill of quantities or tender specification is enough to start. A structured offer follows within 72 hours on average.