Oil & Gas

Explosion-proof equipment — ATEX and IECEx certified

CRS PLUS sources certified equipment for hazardous areas — lighting, junction boxes and enclosures, plugs and sockets, motors and pumps, cable glands, instrumentation and HVAC — for Zone 1 and Zone 2 gas atmospheres and Zone 21 and 22 dust atmospheres. Each item is supplied with its ATEX or IECEx certificate and installation documentation.

Product families

Sourced through the qualified supplier base. Listing does not indicate stock held by CRS PLUS — availability, certification body and lead time are confirmed per enquiry.

Explosion-proof lighting

  • LED linear and batten luminaires
  • Floodlights and high-bay fittings
  • Emergency and exit luminaires
  • Hand lamps and portable torches

Zone 1 and Zone 2 luminaires in Ex d, Ex e and Ex de construction; Zone 21 and 22 for dust atmospheres.

Junction boxes and enclosures

  • Ex e increased-safety terminal boxes
  • Ex d flameproof junction boxes
  • Control and distribution enclosures
  • Ex i intrinsically safe interface housings

Aluminium alloy, stainless steel and GRP bodies with certified entries and terminals.

Plugs, sockets and isolators

  • Interlocked socket outlets 16 A to 125 A
  • Ex plugs and connectors
  • Rotary isolators and switch-disconnectors
  • Local control stations

Interlocked designs prevent withdrawal under load; switched and non-switched variants.

Motors and pumps

  • Ex d and Ex e low-voltage induction motors
  • Ex-certified centrifugal and positive-displacement pumps
  • Fans and extractors

Supplied against IEC frame size, kW rating, zone and temperature class. Motors and pumps are the products most often requested by fuel distributors and terminal operators.

Cable glands and accessories

  • Single and double compression Ex d/Ex e glands
  • Barrier glands for unfilled cable
  • Stopping plugs, adaptors and reducers

Brass, nickel-plated brass and stainless steel, in metric and NPT threads.

Instrumentation and communication

  • Ex cameras and CCTV housings
  • Ex telephones, beacons and sounders
  • Intrinsically safe mobile devices

Certified for use where a spark or surface temperature could ignite an explosive atmosphere.

HVAC and heating

  • Ex air-conditioning units
  • Ex space and process heaters
  • Pressurised (Ex p) enclosures and panels

For control rooms, analyser shelters and enclosed hazardous-area spaces.

Hazardous area zones

Zones classify how often an explosive atmosphere is present. The zone sets the equipment category and the protection concepts that may be used. Classification is to IEC 60079-10-1 for gas and 60079-10-2 for dust.

Hazardous area zone classification
GasDustPresence of explosive atmosphereEquipment category and typical concepts
Zone 0Zone 20Explosive atmosphere present continuously or for long periodsCategory 1 · Ex ia, Ex ma
Zone 1Zone 21Explosive atmosphere likely in normal operationCategory 2 · Ex d, Ex e, Ex ib, Ex p, Ex m
Zone 2Zone 22Explosive atmosphere unlikely, and short-lived if it occursCategory 3 · Ex n, Ex ic, plus all Zone 1 equipment

Ex d, Ex e, Ex i and the other protection concepts

Each protection concept is a different engineering approach to preventing ignition, defined in the IEC 60079 series. The concept determines where the equipment may be installed and how it must be maintained.

Explosion protection concepts
MarkingConceptHow it worksTypical equipment
Ex dFlameproof enclosureThe enclosure withstands an internal explosion and prevents it propagating outward through flame paths.Motors, switchgear, junction boxes, luminaires
Ex eIncreased safetyConstruction measures prevent arcs, sparks and excessive temperatures in equipment that does not normally produce them.Terminal boxes, motors, luminaires
Ex iIntrinsic safetyElectrical energy is limited below the level that could ignite the atmosphere. Ex ia for Zone 0, Ex ib for Zone 1, Ex ic for Zone 2.Instrumentation, sensors, mobile devices
Ex pPressurisedClean air or inert gas maintained inside the enclosure keeps the explosive atmosphere out.Control panels, analyser houses
Ex nNon-sparkingEquipment that does not arc or spark in normal operation, for Zone 2 only.Motors, luminaires
Ex mEncapsulationComponents are potted in a compound so an atmosphere cannot reach them.Sensors, solenoids, small assemblies

What the certificate and marking state

No manufacturer-specific data is published here: CRS PLUS sources from several certified manufacturers and each product carries its own certificate, which governs. These are the items every quotation and certificate will state, and every enquiry should specify.

Certificate and marking parameters
ItemMeaning
Ex marking stringe.g. Ex db eb IIC T4 Gb — protection concept, gas group, temperature class and equipment protection level
Gas groupIIA (propane), IIB (ethylene) or IIC (hydrogen, acetylene) — IIC covers all
Temperature classT1 (450 °C) to T6 (85 °C) — the maximum surface temperature of the equipment
Equipment protection levelGa/Gb/Gc for gas, Da/Db/Dc for dust
Ingress protectionIP rating to IEC 60529, typically IP66 for outdoor hazardous-area equipment
CertificateATEX EU-type examination certificate and/or IECEx certificate of conformity, with the notified or certification body named
Ambient rangeCertified ambient temperature range, which matters in Gulf and African installations

Supply terms

Origin
Sourced per enquiry from a qualified supplier base of certified manufacturers in Europe and Asia. Origin and certification body are stated on each quotation.
Certification
ATEX, IECEx or both, as the project specification requires. Certificate copies supplied with the quotation on request.
Documentation
Certificate of conformity, declaration of conformity, installation and maintenance instructions, routine test certificate where applicable.
Incoterms
Ex-works and FOB as standard. CIF and DAP available to GCC, Levant and African destinations.
Lead time
Standard items from stock to four weeks; motors, pumps and configured assemblies six to twelve weeks. Confirmed per quotation.
Enquiry detail
Zone, gas group, temperature class, IP rating, certification scheme, supply voltage and ambient range. See the FAQ.

Frequently asked questions

What is the difference between ATEX and IECEx certification?

ATEX is the European Union directive framework: equipment for explosive atmospheres placed on the EU market must carry an EU-type examination certificate and CE marking. IECEx is the international IEC scheme, recognised across the Gulf, Africa, Asia and Australia, in which a certification body issues a certificate of conformity against the IEC 60079 series. Many products carry both. Operators in the GCC commonly specify IECEx, ATEX or both; the project specification governs which is required.

What are Zones 0, 1 and 2?

Zones classify how often an explosive gas atmosphere is present. Zone 0 is continuous or long-term presence, Zone 1 is likely in normal operation, and Zone 2 is unlikely and short-lived. Zones 20, 21 and 22 are the equivalent classification for combustible dust. The zone determines the equipment category and the protection concepts that may be used — Zone 0 requires Ex ia, Zone 1 accepts Ex d, Ex e and Ex ib among others, and Zone 2 additionally accepts Ex n and Ex ic.

What is the difference between Ex d and Ex e?

Ex d, flameproof, contains an explosion inside a robust enclosure and cools the escaping gases through engineered flame paths, so it suits equipment that arcs or sparks in normal operation such as switchgear and motors. Ex e, increased safety, prevents ignition sources from arising in the first place by design, so it suits equipment that does not normally spark, such as terminal boxes and certain motors and luminaires. Ex d enclosures are heavier and their flame paths must be maintained; Ex e equipment is lighter and easier to install. Many products combine the two, marked Ex de.

What information is needed to quote explosion-proof equipment?

The zone (0, 1 or 2, or 20, 21, 22 for dust), the gas group (IIA, IIB or IIC), the temperature class (T1 to T6), the required ingress protection rating, the certification scheme required (ATEX, IECEx or both), the electrical supply (voltage, phase, frequency), and the ambient temperature range at the installation. For motors and pumps, the frame size, rated power and duty; for luminaires, the lumen output and mounting; for sockets, the current rating and pin configuration.

Which certificates are supplied with the equipment?

Each item ships with its ATEX EU-type examination certificate and/or IECEx certificate of conformity, the manufacturer’s declaration of conformity, the installation and maintenance instructions required by IEC 60079-14 and -17, and the routine test certificate where applicable. Copies are provided with the quotation on request so the certificates can be checked against the project specification before ordering.

What are typical lead times?

Standard luminaires, junction boxes, glands and sockets are commonly available from stock or within two to four weeks. Motors, pumps and configured control stations are typically six to twelve weeks depending on rating and certification. Lead time is confirmed on each quotation.

Which industries use this equipment?

Oil and gas production, refining and terminals; fuel distribution depots and filling stations; petrochemical and chemical plants; paint and solvent handling; grain, flour, sugar and wood-dust processing; pharmaceutical manufacturing; and mining. Any facility where a flammable gas, vapour, mist or combustible dust may be present in quantities that could ignite.

Where is the equipment sourced from?

CRS PLUS sources explosion-proof equipment from its qualified supplier base of certified manufacturers in Europe and Asia. Origin, certification body and lead time are stated on each quotation. CRS PLUS does not name manufacturers on this page and holds no distribution or agency agreement with any of them.

Request a quotation for hazardous-area equipment

A structured offer follows within 72 hours.

Sending a full specification or a BOQ? Use the full RFQ form.